COST OPTIMISING AND QUICK SET-UP

optimiz costuri - instalare turn racire pe acoperiș

COST OPTIMISING AND QUICK SET-UP

Commercial Center – Mall

The project consisted in the installation of two cooling stations with two BAC VTL cooling towers each.

For the anti frost protection during winter we chose a “Remote Sump” system.

Taking into consideration the location of the Mega Mall and the fact that the cooling towers are installed on the terrace, we needed a solution to optimise the set-up time and crane costs, so we chose VTL towers, 100% assembled in the BAC factory.